Manipur: EVM and VVPAT Verification Begins in Senapati, Kakching Ahead of 2027 Assembly Elections
IMPHAL, November 17: Preparations for the 2027 Manipur Legislative Assembly elections have gathered momentum, with the mandatory First Level Checking (FLC) of Electronic Voting Machines (EVMs) and Voter Verifiable Paper Audit Trail (VVPAT) units commencing in Senapati and Kakching districts on November 16.
The four-day verification exercise, which will continue until November 19, is being conducted to ensure the proper functioning, reliability and election readiness of the voting machines ahead of the upcoming Assembly polls.
In Senapati, authorised engineers from Bharat Electronics Limited (BEL) and the Electronics Corporation of India Limited (ECIL) began inspecting the machines at the District EVM Warehouse situated within the Deputy Commissioner’s Office Complex.
Similarly, ECIL engineers initiated the verification process at the First Level Checking Hall of the Deputy Commissioner’s Office Complex in Kakching.
Officials stated that only EVMs and VVPAT machines that successfully meet the prescribed technical and functional standards will be cleared for deployment during the elections.
The checking exercise is being carried out under the supervision of the respective District Election Officers (DEOs), with oversight from the Chief Electoral Officer (CEO), Manipur, and the Election Commission of India (ECI). Representatives of recognised national and state political parties are also attending the process to observe the verification.
During the exercise in Kakching, Odisha State Nodal Officer Gopinath Kuanr and ECIL Senior Deputy General Manager Prakash Chandra Mandal visited the venue to review the technical inspection, preparedness and storage arrangements.
Meanwhile, the Senapati District Election Office reiterated its commitment to conducting free, fair and transparent elections by strictly adhering to the guidelines and procedures laid down by the Election Commission of India.
The current term of the Manipur Legislative Assembly is scheduled to end on March 13, 2027, making the ongoing verification an important step towards preparations for the next Assembly elections.